版主:bob
    
 · 九阳全新免清洗型豆浆机 全美最低
 
LCA仍然没有达到预期指标(英文),被迫推迟到2014年
送交者: x-file 2012月01月10日15:25:58 于 [世界时事论坛] 发送悄悄话
回  答: 印度LCA最新照片 x-file 于 2012-01-10 15:23:02

Troubles Slow Tejas Again

The photo above, taken at the National Aerospace Laboratory's wind-tunnel, shows testing this year of a Tejas model with various stores configurations. With LCA Tejas final operational clearance slipping to 2014, and the programme still struggling to meet performance specs for the second phase of initial operational clearance (IOC-2), the aircraft project has dipped into another difficult phase. According to sources, several requirements (that were watered down during IOC-1 in January), are still to be met. The parameters include wake penetration certification, all weather clearance (ironically, tests were stalled because of the monsoon earlier this year) and lightning clearance. Earlier this month, IAF chief Air Chief Marshal NAK Browne said again that final operational clearance was delayed by a full year -- moving down to 2014. Meanwhile, the first prototype of the LCA-Navy is preparing for a first flight -- hopefully before New Year.
0%(0)
0%(0)
标 题 (必选项):
内 容 (选填项):
实用资讯
北美最大最全的折扣机票网站
美国名厂保健品一级代理,花旗参,维他命,鱼油,卵磷脂,30天退货保证.买百免邮.


一周点击热帖 更多>>
一周回复热帖
历史上的今天:回复热帖
2011: 司法腐败害人害己,泰安1.04牺牲民警死
2011: 惨不忍睹!共惨党逼的郴州男子在交警大厅